By: Lynxking
Get the Lynxking Check Cord Dog Leash. Our heavy-duty leashes are designed to provide optimal comfort, control, and reliability. The 10ft, 15ft, 30ft, and 50ft leashes are perfect for small, medium, and large dogs. The comfortable handle and long lead make it ideal for dog training and tracking. Experience the Lynxking difference today.
emma: really works and helps with recall. Would recommend but when it gets wet its so hard to dry out. So now smells a bit damp. The bag is great cos load of space to take treats etc for dog in there too. So that's now our going out doggy bag lol
United Kingdom on Nov 19, 2023
Hydrosteve: Nice quality and bright colors. Super lightweight and great value for the money. I got the 30ft for my dog and the connectors are of good material and craftsmanship. Nice little carrying bag to keep all your dog related items in one spot.
United States on Nov 04, 2023
Cynthia Vicuña Brito: Súper resistente
Mexico on Nov 04, 2023
Jeffery Danowski: Great product but the delivery was promise by 10pm the day before & said the product was out for delivery but never received it till 5 pm the next day. Happy with the product but disappointed in the delivery
United States on Nov 01, 2023
Leviathon: I got this for sniff walks. It works really well, no complaints.
The company should consider a version without the neoprene handle, like their shorter leashes. Luckily it's just a sleeve over the rope, it's stitched to itself and not directly to the rope. I snipped off the snitching and removed the neoprene entirely and now it's just a standard rope handle. Much better now!
United States on Oct 30, 2023
siriana: Prodotto molto valido e comodo da usare. Sembra anche resistente. Prima ne avevo uno sempre di 15m a nastro che si annodava sempre, con questo capita raramente e in più è molto leggero
Italy on Oct 27, 2023
Gauer G.: Bon produit , remplir parfaitement son rôle , le seul hic pour moi est la longévité à force de traîner par terre le produit s’use plus au moins vite par rapport au type de terrain empreinté , mais pour le prix y’a pas de soucis si on doit la remplacer tout les 2 ans par une neuve,ce n’est pas contraignant pour nous
France on Oct 01, 2023
HéctorHéctor: The media could not be loaded. En general parece una correa de buen material, aunque es un broche común y el grosor de la correa es delgado y son 15 metros color naranja para verla mejor entre la hierba.
La pedi para entrenar a mi cachorra pastor aleman de 3 meses y creo que es perfecta para eso; lo que quiero decir es que para “entrenar al perro pequeño, mediano va perfecta, o hasta un perro grande pero que no salga disparado o se jalonie mucho, pues quiza podría romperse con un perro de mas de 30 kg. Ya la probe con mi otra perrita pitbull que pesa 24kg, pero ella NO se jalonea. Así que si vas a entrenar a tu perro para acudir el llamado esta perfecto, tomando en cuenta lo anterior. Le pongo 4/5 estrellas por que el grosor es delgado y me hubiera gustado que fuera mas grueso.
Confirme crezca mi pastor aleman ire subiendo actualizaciones para ver que tanto resistio.
Mexico on Sep 26, 2023
RJ: First long lead I’ve purchased for 1 year old 50lb female Pitador. 50’ length is good for some freedom away from you instead of just a few feet. A good length to work on recall, you just have to be able recoil the lead as needed which is the only downside. Which is a bit challenging, if you don’t let out the full slack and have to hold it at say 25’ if that’s your working distance, and it’s not the easiest to hold if the dog is pulling, but most of the time not a big problem.
Downside, when my dog is allowed to be Free, she usually bolts and when on the lead the slack uncoils fast, and in about 2-3 seconds she is already at the 50’ length and if you don’t have gloves on to try and stop the dog from getting yanked back your hands are gonna get rope burn. The first time I was using this she took off unexpectedly while she was using a full harness with the lead clipped to her front chest , underneath d ring, and she flipped head over paws, so just be careful, about full speed running, especially if you have the lead attached to a typical neck collar. I only attach this to her harness and use a collar for a 5’ leash.
All in all a great lead. I like high...
United States on Jun 23, 2023
| Lynxking Check Cord Dog Leash: Long Lead for Training and Tracking | 6ft Long Dog Leash with New, Stronger Clip | Primal Pet Gear | Long Dog Leash for Obedience Recall Training by iYoPets | |
|---|---|---|---|
![]() |
![]() |
![]() |
|
| B2B Rating |
86
|
98
|
97
|
| Sale off | $1 OFF | ||
| Total Reviews | 386 reviews | 2 reviews | 412 reviews |
| Manufacturer | Keenleader.,ltd. | No | iYoPets |
| Item model number | LL-1 | PPG-DHDL-6FT-BLACK-BLUE | |
| ASIN | B07VH54ZV8 | B07FP4CR34 | B08BTZZX7R |
| Product Dimensions | 360 x 0.38 x 0.38 inches; 12.35 Ounces | 72 x 1 x 0.11 inches; 5.61 Ounces | |
| Brand | Lynxking | Primal Pet Gear | IYoPets |
| Date First Available | July 20, 2019 | June 5, 2018 | June 24, 2020 |
| Color | Black | Black-Blue | Black |
| Size | rope3/8"x30' | 6FT | One size |
| Material | Polypropylene, Metal | Nylon | Nylon |
| Product Dimensions | 360"L x 0.38"W | 72 x 1 x 0.11 inches; 5.61 Ounces |
United States on Nov 24, 2023